Whole-house and single-room refurbishment run by one team: structure, services, plastering, joinery and finishes sequenced properly so the house comes back together in one programme rather than a queue of trades.
Free consultation and site visit. JCT contract with a 12-month defects period on every project.
ARB
Registered architect available in-house
JCT
Contract with valuation-based staged payments
12 months
Defects period as standard
£5m
Public liability insurance
5.0★
Google rating from 19+ verified reviews
The Service
Bring the house you haveup to the standard you want
Refurbishment covers everything from a full strip-back and rewire to reconfiguring a floor, replacing bathrooms and kitchens, or renewing finishes throughout. We plan the sequence, run the trades and hand back a finished house.
It suits owners of tired period property, buyers renovating before moving in, landlords upgrading a rental between tenancies, and anyone whose house works structurally but not practically.
The best time is before you move in or while the property is empty. Working around an occupied house adds weeks and makes dusty work harder for everyone, though we do it regularly where there is no alternative.
Professional help matters because refurbishment is mostly sequencing. Strip-out, structure, first fix, plaster, second fix and decoration have to happen in order, and a single trade arriving out of turn costs a fortnight.
Whole house or single rooms
From full renovations to kitchens, bathrooms, flooring, plastering, joinery and decoration.
Structural changes handled
Wall removals, new openings and layout changes designed with our partner structural engineer and building control where notifiable.
Services renewed properly
Rewiring, plumbing, heating and ventilation planned at first fix, with certification on completion.
Period property experience
Including conservation areas and listed buildings: a Grade II listed scheme in Notting Hill among recent work.
What It Costs To Get Wrong
Refurbishment punishespoor sequencing
Renovations rarely fail dramatically. They drift: weeks lost between trades, budget absorbed by rework, and a finish that never quite lands.
Managing your own trades
Each trade optimises their own week, not your programme. Gaps between them are where months and money disappear.
Decorating over old services
New finishes laid over ageing wiring or pipework means pulling them apart again within a few years to do the job properly.
Structural work done without design
Removing walls without calculations or building control risks the structure and creates a problem at survey when you sell.
Damp and defects covered up
Plastering over damp, movement or rot hides the symptom and lets the cause keep working behind the finish.
Scope creeping without control
Without a defined scope and valued payments, small additions accumulate into an unrecognisable budget.
Our Process
Five stages, one company,no gaps in between
01
Free consultation & survey
We walk the property, note structural, damp and service conditions, and agree what genuinely needs doing against what you want doing.
02
Design & scope
Layouts, specifications and finishes are set out, with our ARB registered architect involved where the work changes the plan or the structure.
03
Approvals & programme
Building control, structural calculations and any listed or conservation consents arranged, then the trade sequence and programme fixed.
04
Strip-out to second fix
Strip-out, structure, first fix services, plastering, joinery, second fix and decoration, run by our own staff under a JCT contract.
05
Completion & 12-month defects
Snagging, certification for electrical and gas work, handover and a 12-month defects period as standard.
What You Get
The practical differenceon your project
One programme, not twelve diaries
We coordinate the trades so each arrives when the previous one has finished, which is where the time saving actually comes from.
Problems found before pricing
Damp, movement and dead services are identified at survey rather than becoming variations halfway through.
Design input where it pays
An ARB registered architect on hand means layout changes are properly considered instead of improvised on site.
Certified services
Electrical and gas work certified, and structural alterations signed off by building control.
Payments tied to progress
Valuation-based staged payments under a JCT contract, assessed against completed work.
Cover and comeback
£5m public liability, £10m employers' liability and a 12-month defects period on every project.
In Detail
Scope, sequence and thedetail behind a good finish
Refurbishment scope varies enormously. What stays constant is the order of work and the parts of it you cannot see once it is finished.
What a refurbishment can include
Scope is agreed against condition and budget rather than assumed: some houses need everything, most need three or four of these.
Full strip-out and whole-house renovation
Rewiring, replumbing, new heating and improved ventilation
Layout changes, wall removals and new structural openings
Kitchen and bathroom replacement
Plastering, flooring, joinery, staircases and built-in storage
Insulation upgrades, glazing replacement and decoration throughout
Sequence and why it matters
The order is strip-out, structure, first fix, plaster, second fix, decoration. Reversing any two of those means undoing work: chasing a new socket into fresh plaster, or lifting a finished floor to reach a pipe.
Long-lead items, glazing, bespoke joinery, stone worktops, specialist tiles, are ordered against that programme rather than when the space is ready for them.
Period property and listed work
Older houses need breathable finishes, sympathetic materials and care with original features. Modern impermeable materials applied to solid walls frequently create the damp they were meant to cure.
Listed buildings and conservation areas need consent for work that would be routine elsewhere. Our architectural side handles those applications alongside the build.
Damp, movement and old structure
Rising damp, penetrating damp and condensation have different causes and different remedies. Diagnosing correctly matters more than the product used to treat it.
Historic movement, undersized joists and previous unrecorded alterations are common in period stock. Where structure is involved we bring in our partner structural engineer rather than guess.
Occupied homes and rental property
Where you stay in the property we phase the work, protect finished areas, and keep at least one bathroom and a cooking space live throughout. Site hours are Monday to Friday, 9am to 5pm.
For landlords, refurbishment between tenancies runs against a fixed handover date, prioritising compliance items, electrical certification, heating, ventilation and fire safety, alongside the visible upgrades that drive rent.
Combining with extensions and lofts
Refurbishment is often best paired with an extension or loft conversion. Running them under one contract shares the strip-out, scaffolding, first fix and decoration rather than paying for them twice.
Because architecture and construction are both in-house, a combined scheme is designed as one project rather than stitched together from two.
Energy performance and comfort upgrades
Refurbishment is the cheapest moment to improve how a house performs, because the walls, floors and ceilings are already open. Loft and floor insulation, draught sealing, glazing replacement and heating controls all cost a fraction of what they cost as standalone jobs later.
Ventilation has to move in step with insulation. Sealing a period house tightly without providing controlled ventilation is the most common route to condensation and mould in a newly finished property, so extract, trickle ventilation and, where appropriate, mechanical ventilation are specified alongside the insulation rather than after it.
Where a property is being upgraded for letting, energy performance also carries a compliance dimension, and the work is prioritised so the certificate reflects the money spent.
Bathrooms, kitchens and wet areas
Bathrooms and kitchens absorb a disproportionate share of a refurbishment budget and of the risk. Tanking, falls to waste, waterproof substrates behind tiling and correctly sized extraction are what separate a bathroom that lasts fifteen years from one that fails in three.
We set out sanitaryware, drainage runs and services before first fix so pipework is concealed properly rather than boxed in as an afterthought, and we agree tile, stone and sanitaryware selections early because they are frequent sources of delay.